Live
Operational overlay
Current warehouse and equipment signals are shown with freshness and source context.
Truth modes
Ysend places warehouse geometry, inventory, people and equipment overlays in one spatial model, but every view keeps its data mode explicit. A saved plan and a simulated scenario never masquerade as current operations.
Three modes
Live
Current warehouse and equipment signals are shown with freshness and source context.
Saved
A versioned plan captures structure for review and structural comparison; it is not live telemetry.
Computed
A scenario produces modeled outcomes from declared inputs and assumptions; it is not an observed result.
Snapshot diff
Saved warehouse plans preserve structural intent for design review, including zone presentation and a structural diff between snapshots.
Save the layout and how it is displayed at a known point in time.
Review added, removed or changed structures between two saved plans.
Use the diff as design evidence; a separate approved change path updates operations.
Replay window
The replay starts from persisted warehouse, mission and equipment records.
Work decisions, telemetry, interventions and outcomes keep source attribution.
The review distinguishes missing data, stale state, controller refusal and warehouse exceptions.
Scenario lab
Scenarios can explore topology, work mix, resource policy and automation behavior before an approved operational change.
A versioned topology, demand set, resource model and policy assumptions.
A deterministic scenario or optimizer produces a candidate result with its configuration.
Candidate outcomes are compared with the declared baseline, never silently merged into live KPIs.
Any operational change follows its own review, authority and rollout path.
Calibration rule
Bring the facility model, signal sources, required freshness, replay window and scenario assumptions. We will keep every truth mode explicit.