Fixed-automation integration

Connect warehouse intent to machines without bypassing safety.

Available with configuration

XMS Cloud orchestrates business work at the warehouse control boundary. WCS, PLC, robot, and certified safety logic retain motion, interlock, and machine authority.

Authority model

Mission and semantic command are not raw device control.

Authorize work

Validate tenant, warehouse, task, lifecycle, operator, resource, and automation policy before creating machine intent.

Check conditions

Resolve allowlisted command, configured tags, permissives, quality, equipment state, and shared-resource reservation.

Issue through edge

Send the configured HTTP, Modbus/TCP, raw-TCP, or WCS request through its bounded adapter—not a public backend-to-PLC socket.

Observe and reconcile

Record issued, acknowledged, completed, rejected, timed-out, faulted, and physically divergent state.

Cataloged fixed-automation dialects

Qualify the equipment and protocol combination.

Runbow sorter WCS

HTTP top-scan sortation integration with vendor exchange recording and sortation workflow tests.

Configuration required

Robotic pick-cell PLC

Modbus/TCP dialect for governed pick-cell work, reports, state, and failure handling.

Configuration required

Conveyor segment PLC

Modbus/TCP dialect for segment work and observed state; routing and safety topology remain site-specific.

Configuration required

Packaging machine PLC

Modbus/TCP plus bounded raw-TCP label channel for packaging-machine jobs and reports.

Configuration required

Simulated equipment

In-process sorter, pick-cell, conveyor, and packaging adapters for workflow and failure rehearsal.

Available

Commissioning evidence

Force the unsafe and unknown states before go-live.

Permissive missing

Refuse before write.

Remove guard-closed, E-stop-clear, zone-empty, downstream-ready, or another configured permissive.

Bad tag quality

Unknown is not safe.

Return stale, uncertain, or bad quality and verify no command is inferred as accepted or complete.

No acknowledgement

Expire under watchdog.

Issue a permitted command, withhold acknowledgement or completion, and retain timeout evidence.

Physical divergence

Raise one persistent alert.

Make lane, load, cell, or machine observation disagree with reservation and work state.

Unknown fault

Require classification.

No automatic reset until safe state, fault class, checklist, operator acknowledgement, and restart authority are explicit.

Adapter change

Invalidate stale proof.

Firmware, PLC program, tag map, WCS build, protocol, or equipment change requires regression and evidence refresh.

Packaging finish line

Supervise health and work across the end-of-line.

Carton erectors, sealer/labellers, conveyors, palletizers, and supporting machines expose job, health, consumable, fault, and OEE context to warehouse control.

  • Machine work stays related to carton, order, pallet, and station.
  • Command and acknowledgement remain separate states.
  • Local equipment and safety logic remain authoritative.
Packaging finish-line board showing machine health, work, consumables, exceptions, and OEE
Warehouse supervision across connected packaging equipment.

WCS and PLC review

Bring the topology, equipment list, protocols, tag map, safety ownership, and failure matrix.

Define authority, network zones, commands, permissives, acknowledgements, evidence, restart, and change control.